Este produto não é mais promovido em Made-in-China.com. Se você encontrar qualquer violação ou informação sensível do mesmo, entre em contato conosco para tratamento. Obrigada.

Prefab Steel Structure Materials Storage Warehouse

Contatar Fornecedor

Mr. Daffy
Oversea Manager
Membro Diamante Desde 2011

Fornecedores com licênças comerciais verificadas

Manufacturer/Factory

Informação Básica.

N ° de Modelo.
SBS-W5
Mercadorias características
Armazém de Material
Função
Tipo de armazenamento Stereoscopic Warehouse
operação
Artificial endereçamento automático Carregando
Certification
SGS,BV,ISO
Derusting
Ball Blast
Connection
High Strength Bolt
Materials
Q235B or Q345
Door
Sliding Door or Automatic Rolling Door
Window
PVC or Aluminium Alloy Window
Cutting
CNC Gas Cutting Machine
Painting
Automatic Powder Coating or Painting
Design
Steel Structure Warehouse by Customized
Size
Steel Structure Warehouse by Customized
Pacote de Transporte
Sea Worthy
Especificação
by Customized
Marca Registrada
SBS
Origem
Foshan, Guangdong, China
Código HS
9406000090
Capacidade de Produção
120000 T/Year

Descrição de Produto

1. PRODUCT DETAIL INFORMATION
If you want to do the steel structure project please supply this information, we can give you the quotation and plan drawing according this requirement.



2. THE DETAIL MATERIAL FOR THE STEEL STRUCTURE
Main Material Of Steel Frame(GB-Q235B, Q345B): H section, I section, Square tube, Circular Tube, Floor decking steel sheet, C section, Z section, Angle iron, Steelbar, Steel plate.
Surrounding material:
Wall&Roof: Single colorful corrugated steel sheet, sandwich panel with EPS, ROCK WOOL, PU insulation thickness around 50 mm ~ 100 mm.
Other Accessories: Gutter(galvanized sheet/stainless steel), PVC downspout, Ventilation Ball, Lighting Board etc.


3. SERVICE PROCESS
Discussing project ---Design plan drawing---Budget"e---Confrim drawing"ation---Sign the contract---Deepon drawing---Make the shop drawing---Production---transportation--shipping---Foundation Ready&Installation Tools&Workers---installation
4. DESIGN:
If you have the drawing, We are welcome you to send. If not, we also have professional designer.

Basic design => customer opinion => design confirmation => shop drawing
Design capability: Professional designer team who are able to R&D and design various houses. More than 12 years of working experience on steel structure design.
5. STRICT AND DEDICATED PRODUCTION FLOW
Design drawing---shop drawing--prepare material--Automatic submerged arc welding--assembly--muti-head digital cutting machine--flange plate of straightening--riveter manufacture--welding--semi-manufacture--shot blasting and descaling--spray paint --transportation--installation



6. OUR EQUIPMENT MECHANICS
Muti-head digital cutting machine---H section steel auto assemble machine--MZG -2X1000 automatic submerged arc welding--GP series HGQ1218-8 type shot blasting and derusting machine---Punching machine---Digital control drilling machine---JZ-400A series H section steel flange straightening machine---Hydraulic pendulum plate shears---Enveironmental friendly and recycling equipment

7. TRANSPORTATION
Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:


Seaworthy
In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.

Package for the steel frame
If you want to use the 40 HQ container to transportation the whole steel structure product. You can do the steel frame to package, use the cable wire to fix. But you must paid for the steel frame and baling charges.

8. GUIDANCE INSTALLATION
Shengbang Steel Structure Company can supply the guidance installation service. Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China. But customer should coordinate with us for following aspects:
Customer should provide:
1) Translator or assistant on site.
2. )All costs raised including:
A. Visa fee
B. Round trip flight ticket
C. Accident insurance for the supervisor during the period
D. Accommodation
E. Daily meals
F. Internet
G. Local traffic fee (if any)
3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
4)Customer has the responsibility to provide necessary security system to protect the supervisor, especia

Envie sua pergunta diretamente para este fornecedor

*De:
*Para:
avatar Mr. Daffy
*Mensagem:

Digite entre 20 a 4000 caracteres.

Isso não é o que você está procurando? Solicitar postagem de fornecimento agora

Encontre Produtos Semelhantes por Categoria

Página Inicial do Fornecedor Produtos Armazém Prefab Steel Structure Materials Storage Warehouse

Também Pode Gostar

Contatar Fornecedor

Mr. Daffy
Oversea Manager
Membro Diamante Desde 2011

Fornecedores com licênças comerciais verificadas

Manufacturer/Factory
Certificação de Sistema de Gestão
ISO 9001
Ano de Exportação
2010-11-30