Fundição do tipo de máquina: | Hot Câmara Die Casting Machine |
---|---|
Die Casting Método: | Precision Fundição |
Aplicação: | Peças de maquinaria |
Usinagem: | Usinagem CNC |
Material: | Liga de Alumínio |
Preparação da superfície: | Polido |
Fornecedores com licênças comerciais verificadas
Die casting production process
Die-casting orders → die-casting mold design → die-casting mold manufacturing → die-casting machine test mold, mold installation →die-casting demoulding → shot blasting, sandblasting → polishing/grinding, cleaning → electroplating, painting → die-casting coarse/finishing processing →quality inspection →shipment
Surface treatment
We use a variety of surface treatment,anodizing,brushing,galvanized,laser engraving,plating,polishing,powder
coating,sandblasting,silk prinnting,you have a variety of options.
Manufacture Process:
1.Review the part design,drawings and quality standard from clients.
2. Mould and Tooling design & manufacturing
3. Mould and Tooling testing & confirm the sample
4. Die casting raw castings
5.Surface treatment: Trimming,Deburring, polishing, cleaning, passivation & power coating
and other requirement from Customer
6. Precision machining: CNC lathes, milling, drilling, grinding etc
7. Full Inspection
8. Packing
9. Delivery
Material | Aluminum Alloy ADC12 ,A380, Al 6061 |
Surface Treament | Anodising, powder coating, sand blasting, painting |
Part Weight | from 3 g --- 20kgs |
Application | Industry fittings and Construction and Decoration. |
Casting Machine | 200-1200 tons |
Capability | Output 100 tons per month. |
New Moulds | Opening new mould about 30 days . |
Fabrication | Die designing→Die making→Smelting&alloying→QC→Die casting→remove burrs →QC→Surface treatment→QC→Packing→QC→Shipping→After Sale Service |
Deep Processing | CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling |
Certification | 1. ISO9001-2008/ISO 9001:2008; |
2. GB/T28001-2001(including all the standard of OHSAS18001:1999); | |
3. GB/T24001-2004/ISO 14001:2004; | |
4. GMC. | |
MOQ | As custimer's . Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ. |
Free Samples | YES |
Payment | 1. T/T: 50% deposite, the balance will be paid before delivery; |
2. L/C: the balance irrevocable L/C at sight. | |
Delivery time |
|
2. Bulk Order: 30-40 days | |
OEM | Available. |
Fornecedores com licênças comerciais verificadas