• Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
  • Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
  • Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
  • Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
  • Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
  • Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Favoritos

Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner

Warranty: 1 Year
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Multi Cavity
Plastic Material: PE
Process Combination Type: Progressive Die

Contatar Fornecedor

Fabricante/Fábrica & Empresa Comercial

Tour Virtual 360 °

Membro Diamante Desde 2024

Fornecedores com licênças comerciais verificadas

Zhejiang, China
Importadores e Exportadores
O fornecedor tem direitos de importação e exportação
Escolha de compradores com alta repetição
Mais de 50% dos compradores escolhem repetidamente o fornecedor
Experiência de Exposição
O fornecedor participou de feiras off-line, você pode conferir o Audit Report para mais informações
para ver todos os rótulos de força verificados (19)
  • Visão Geral
  • Product Parameters
  • Product Description
  • Mould Production Process
  • FAQ
Visão Geral

Informação Básica.

N ° de Modelo.
XS202404265
Application
Plastic Package
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
DME
Customized
Customized
After-sales Service
1 Year
molde aço
P20h, 718h, 2316, S136, 2738, Setc
Mould Spare Part
Ejectors/Watertips/Rings/Seal Rings/
Mold 3D Format
STP/Step/X-T/Igs
vida útil do molde
1 milhão de disparos
Hot Runners Brand
Yodo, Sure, etc
Pacote de Transporte
Exported Wooden Case
Marca Registrada
OEM/ODM
Origem
Tai Zhou, China
Código HS
8480719090
Capacidade de Produção
200sets/Year

Descrição de Produto

Product Parameters
Mould name Professional Plastic Injection Water Bottle Caps Mold Mineral Water Bottle Cap Mould Manufacturer
Mould cavity number multi cavity
Mould runner systerm hot runner/cold runner
Mould T1 Time 25-45days
Mould package exported wooden case
Mould Life 0.5-1million shots
Mould core&cavity steel P20H,2738,718H,ETC
Mould core&cavity steel S45C,S50C,P20
 
Product Description

We started making mineral cap moulds since 2009. After decade years development , the injection cap mould made by us always with high quality and mold efficient running.Clients speak highly of our cap moulds quality, fast production, shot cycle time 12s, no flash, and cap production have good performance. 
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner




§ Mineral Cap Mould Steel
Mineral cap mould core and cavity with inserts design. Core and cavity use hardness very high steel. Such as S136, 2316, H13, etc. Detail steel will depends on the cap design, cap material and customer's requirement. But all these mould steel hardness can be treated to HRC48 - HRC52.

§ Mineral Cap Mould Runner System

Mineral cap mould runner system can be hot runner and cold. Detail depends on the cap design. The cold runner submarine gate fit for them mineral cap which gate mark allowed on the cap side face. Usually gate position on the cap open area, so that injection can be got balance and gate mark can be hided below top cover.Hot runner system become more and more popular for the plastic injection mould, because it's better heating efficiency and no plastic material wast during injection molding. And cap mould with hot runner system can get shorter cycle time. Hot runner gate mark usually on the cap main body top face which the same position for the cold runner three plates mould structure.cap moulds use lots of inserts. Especially for the core inserts. Some mineral cap mould need unscrew structure. The thread inserts need to be designed with gears. Insrts have to be tooled by precision tooling machine to insure the inserts part with good sizes finish and make the assembling no any problem.
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner


§Mineral Cap Mould Design

Mineral cap mould drawing is another important thing. Mineral cap mould quality start from mold drawing. Mould structure and mould sizes are decided by drawing. we pay the focus on the mold drawing to insure the cap mould project with a good start.With client's requirement we can provide CMM inspect mold key parts, such as inserts, and cavity inserts and core inserts.

§ Mineral Cap Mould Machining

We have CNC tooling center, CNC milling machine, CNC engraving machine, CNC lathe machine. EDM machine. Due to have own machining room, the mould delivery time can be easily control. Our moulds are delivery on time as schedule. Fast mould delivery and great mould quality make us win maket successfully
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner
 
Mould Production Process

Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner

FAQ

Q1: Are you mould factory or mould trader?
Answer: We are speciallized plastic injection mould factory locacted in Taizhou, China

Q2: How to visit your company?
Answer: Our city is near Shanghai, When you arrive at Shanghai airport, you can by high speed train from Shanghai Hongqiao train station to Taizhou Station. We will pick you up from train station.

Q3: What's the payment term?
Answer: TT, 40% advance payment, balance amount be paid before mould shipment.

Q4: How can I achieve satisfied product design?
Answer: In the begining, you may only have a rough product idea or rough product drawing, we are capable to make initial design and  imporove the rough product drawing till to completed and satisfied drawing through effective mutual communication. Finally we will figure out the whole project secessfully.

Q5: How about delivery time?
Answer: The T1 trial time normally 25-70days depends on different mould. After trial samples are approved by client, moulds can be shipped within one week.

Q6: What are the services do you offer?
Answer: We offer lots of services to our clients,including product drawing improvement, mould 2D&3D design,prototype samples, mould flow analysis, DFM report,after-sale service,etc

Envie sua pergunta diretamente para este fornecedor

*De:
*Para:
*Mensagem:

Digite entre 20 a 4000 caracteres.

Isso não é o que você está procurando? Solicitar postagem de fornecimento agora

Encontre Produtos Semelhantes por Categoria

Página Inicial do Fornecedor Produtos Molde com tampa de plástico Plastic Injection Beverage Drinking Mineral Water Bottle Cap Closure Lid Cover Mould with Hot/Cold Runner